Chapter
24:
IRRIGATION AND POWER
ANNEXURE I Abstract
of benefits anticipated from major and medium irrigation projects
(referred to in paragraphs 8 and 11)
('000crores) gross area
|
State |
irrigation
on full develop- ment from First and Second Plan schemes |
First
and Second Plan Schemes |
new
schemes of Third Plan |
total
from continuing schemes and new schemes of Third Plan to end of Third
Plan |
additional
benefits inThird Plan |
potential
created to end of Second Plan |
utilisation
to end of Second Plan |
potential
to end of Third plan |
utilisation
to end of Third Plan |
potential
to end of Third Plan |
utilisation
to end of Third Plan |
potential
(col. 5+ (7) |
utilisation
(col. 6+ (8) |
potential
(col. 9-3)
|
utilis-
ation (col. 10-4) |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
1 |
Andhra
Pradesh |
3720 |
830 |
736 |
3361 |
2159 |
134 |
134 |
3495 |
2293 |
2655 |
1557 |
2 |
Assam |
|
|
|
|
|
88 |
79 |
88 |
79 |
88 |
79 |
3 |
Bihar |
5569 |
915 |
720 |
3192 |
2402 |
482 |
318 |
3674 |
2720 |
2759 |
2003 |
4 |
Gujarat |
3809 |
640 |
227 |
1716 |
1091 |
|
|
1716 |
1091 |
1076 |
864 |
5 |
Jammii
and Kashmir |
163 |
5 |
5 |
55 |
32 |
11 |
11 |
66 |
43 |
61 |
38 |
6 |
Kerala |
555 |
358 |
358 |
527 |
527 |
86 |
86 |
613 |
613 |
255 |
255 |
7 |
Madhya
Pradesh |
2242 |
95 |
75 |
1365 |
905 |
40 |
20 |
1405 |
925 |
1310 |
853 |
8 |
Madras |
890 |
611 |
581 |
791 |
789 |
33 |
33 |
824 |
822 |
213 |
241 |
9 |
Maharashtra |
1248 |
233 |
105 |
999 |
713 |
353 |
100 |
1352 |
813 |
1119 |
733 |
10 |
Mysore |
1480 |
707 |
324 |
1348 |
1173 |
52 |
27 |
1403 |
1233 |
693 |
876 |
11 |
Orissa |
2615 |
1000 |
720 |
2287 |
1666 |
|
|
2287 |
1655 |
1237 |
91.5 |
12 |
Punjab |
4351 |
3307 |
2957 |
4157 |
4058 |
200 |
200 |
4357 |
4258 |
1050 |
1331 |
13 |
Rajasthan |
3666 |
734 |
618 |
2357 |
1754 |
25 |
9 |
2332 |
1753 |
1613 |
1145 |
14 |
Uttar
Pradesh |
4262 |
2118 |
1479 |
2800 |
2423 |
912 |
98 |
3712 |
2521 |
1591 |
1342 |
15 |
West
Bengal |
2990 |
1690 |
1084 |
2051 |
1936 |
32 |
32 |
2103 |
1953 |
413 |
834 |
|
total |
37560 |
13243 |
9989 |
27026 |
21628 |
2448 |
1147 |
29474 |
22775 |
16231 |
12786 |
Additional utilisation in
Third Plan form the continuing schemes of First and Second Plans (col.
6 col. 4)==11,639,000 acres.
ANNEXURE II Abstract
of estimated cost of major and medium irrigation projects
and outlays on them in the Third Plan (referred to in paragraph12)
(Rs. Lakhs)
|
State |
estimated
cost of First and Second Plan schemes |
schemes
continuing from First and Second Plans in to Third Plan |
new
schemes of Third Plan |
total
provision in Third Plan for continuing and new schemes (col.5+ col.
7) |
estimated
cost |
carry-over
from Second Plan |
outlay
for Third Plan |
estimated
cost |
outlay
in Third Plan |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
1 |
Andhia
Pradesh |
16536 |
13941 |
6745 |
6548 |
1842 |
832 |
7380 |
2 |
Assam
|
170 |
|
|
|
277 |
228 |
228 |
3 |
Bihar
|
10743 |
9094 |
7118 |
4712 |
3144 |
1445 |
6157 |
4 |
Gujant
|
17411 |
17267 |
12098 |
5014 |
110 |
110 |
5124 |
5 |
Jammu
and Kashmir |
1529 |
1285 |
1141 |
556 |
130 |
44 |
600 |
6 |
Kerala
|
2635 |
2262 |
378 |
378 |
2150 |
764 |
1142 |
7 |
Madhya
Pradesh |
8860 |
8402 |
5097 |
3600 |
2364 |
560 |
4160 |
8 |
Madras
|
6086 |
4602 |
2150 |
2i50 |
689 |
592 |
2742 |
9 |
Maharashtra
|
10438 |
10360 |
6637 |
5034 |
3174 |
1570 |
6604 |
10 |
Mysore
|
10853 |
10328 |
3897 |
3341 |
3757 |
725 |
4066 |
11 |
Orissa
|
10226
* |
10184* |
2657 |
1911 |
807 |
230 |
2141 |
12 |
Punjab
|
11424 |
10193 |
1348 |
904 |
4882 |
1300 |
2204 |
13 |
Rajasthan
|
14074 |
13987 |
8069 |
5770 |
6450 |
2740 |
8510 |
14 |
Uttar
Pradesh |
8966 |
6938 |
4109 |
2422 |
4024 |
2749 |
5171 |
15 |
West
Bengal |
8407 |
8104 |
2646 |
1206 |
749 |
686 |
1892 |
16 |
Union
Territories |
10 |
10 |
10 |
10 |
|
|
10 |
17 |
Central
Schemes |
|
|
|
|
1803
@ |
1803@ |
1803
@ |
|
total
|
138368 |
126957 |
64100 |
43556 |
36352 |
16378 |
59934 |
* Includes cost of Hirakud Stage I (Power
portion). includes Rs. 1000 lakhs for supplying water to Bokaro Steel
Plant and other industries.
ANNEXURE III Abstract
of estimated cost and outlays on flood-control, drainage,
anfi-waterlogging and anti-sea-erosion schemes (referred to in paragraph
12)
(Rs. lakhs)
|
State |
schemes
continuing from First and Second Plans into Third Plan
|
new
schemes of Third Plan
|
total
provision in Third Plan for continuing and new schemes (col. 4+ col.
6) |
estimated
cost |
carry-over
from Second Plan |
outlay
for Third Plan |
estimated
cost
|
outlay
in Third Plan |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
1 |
Andhra
Pradesh |
195 |
35 |
35 |
210 |
208 |
243 |
2 |
Assam |
436 |
115 |
115 |
507 |
385 |
500 |
3 |
Bihar
|
2532 |
700 |
700 |
291 |
200 |
900 |
4 |
Gujarat
|
60 |
50 |
50 |
|
|
50 |
5 |
Jammu
and Kashmir |
1060 |
855 |
855 |
45 |
45 |
900 |
6 |
Kerala |
302 |
71 |
71 |
431 |
350 |
421 |
7 |
Madhya
Pradesh |
235 |
9 |
9 |
11 |
11 |
20 |
8 |
Madras
|
|
|
|
|
|
|
9 |
Maharashtra |
|
|
|
30 |
30 |
30 |
10 |
Mysore
|
|
|
|
|
|
|
11 |
Orissa |
74 |
48 |
48 |
300 |
202 |
250 |
12 |
Punjab |
770 |
432 |
432 |
2216 |
1069 |
1501 |
13 |
Rajasthan
|
110 |
90 |
90 |
|
|
90 |
14 |
Uttar
Pradesh |
568 |
56 |
56 |
602 |
519 |
575 |
15 |
West
Bengal |
2305 |
84 |
84 |
847 |
431 |
515 |
16 |
Union
Territories |
79 |
69 |
69 |
164 |
68 |
137 |
|
total |
8726 |
2614 |
2614 |
5654 |
3518 |
6132 |
ANNEXURE IV Multipurpose
and major irrigation schemescontinuing from First and
Second Plans into Third Plan (referred to in paragraph 16)
|
name
of scheme and State |
total
cost (irrigation portion only) (Rs. lakhs) |
outlay
for Third plan (Rs. lakhs) |
utilisation
('ooo acres) gross area |
on
completion |
to
end of Second Plan |
to
end of Third Plan |
|
1 |
2 |
3 |
4 |
5 |
6 |
1 |
Bagh
(Maharashtra) |
610 |
120 |
60 |
|
2 |
2 |
Banas
(Gujarat) |
827 |
605 |
110 |
|
59 |
3 |
Banas
(Rajasthan) |
776 |
150 |
200 |
|
|
4 |
Bama
(Madhya Pradesh) |
552 |
200 |
173 |
|
|
5 |
Bhadra**
(Mysore) |
3193 |
1310 |
245 |
32 |
182 |
6 |
Bhakra
Nangal** (Punjab and Rajasthan) |
10189 |
419 |
3604 |
2550 |
3604 |
7 |
Chambal
(Stage I and II) (Rajasthan and Madhya Pradesh) |
5485 |
1703 |
1400 |
60 |
800 |
8 |
Damodar
Valley** (West Bengal) |
3468 |
116 |
1273 |
610 |
1023 |
9 |
Gandak**
(Bihar and Uttar Pradesh) |
4945 |
3000 |
3138 |
|
300 |
10 |
Ghataprabha
left bank canal (Stage I and II) (Mysore) |
1863 |
572 |
298 |
53 |
180 |
11 |
Girna
(Maharashtra) |
865 |
519 |
143 |
|
116 |
12 |
Hirakud
**(Stage I) including Mahanadi Delta (Orissa) |
9334* |
1200 |
2158 |
710 |
1337 |
13 |
Itiadoh
(Maharashtra) |
692 |
200 |
75 |
|
1 |
14 |
Kadam
(Andhra Pradesh) |
601 |
90 |
75 |
25 |
75 |
15 |
Kakrapar
canal (Lower Tapi) (Gujarat) |
1870 |
400 |
562 |
50 |
296 |
16 |
Kangasabati
project (West Bengal) . |
2526 |
807 |
950 |
|
250 |
17 |
K.C.
canal (Andhra Pradesh) |
659 |
100
1W |
346 |
230 |
346 |
18 |
Khadakwasia
(Maharashtra) |
1055 |
596 |
43 |
|
43 |
19 |
Kosi
(Bihar) |
2482 |
1200 |
1397 |
|
900 |
20 |
Mahi
(Stage I and 11) (Gujarat and Rajasthan) |
4178 |
876 |
751 |
29 |
214 |
21 |
Malampuzha
(Kerala) |
532 |
31 |
109 |
95 |
109 |
22 |
Matatila
dam (Uttar Pradesh) . |
1283 |
272 |
413 |
220 |
370 |
23 |
Mayurakshi
(West Bengal) |
2105 |
210 |
720 |
462 |
580 |
24 |
Mula
(Maharashtra) |
1500 |
600 |
162 |
*
* |
8 |
25 |
Nagarjunasagar**
(Andhra Pradesh) . |
9112 |
5000 |
2060 |
|
900 |
26 |
Narmada
(Broach)
(Gujarat) |
4309 |
1200 |
963 |
|
|
27 |
Parambikulam
project** (Madras) |
2487 |
2112 |
240
|
|
150 |
28 |
Puma
(Maharashtra) |
1284 |
861 |
152 |
|
94 |
29 |
Rajasthan
canal (Rajasthan) |
6647 |
3800 |
1684 |
|
284 |
30 |
Ramganga
project* *
(Uttar Pradesh) |
3455 |
1600 |
1705 |
|
175 |
31 |
Ujh
dam or Tawi project (Jammu and Kashmir) |
900 |
332 |
62 |
|
|
32 |
Sarda
sagar (Stage II)
(Uttar Pradesh) |
636 |
169 |
185 |
40 |
105 |
33 |
Shetrunji
(Gujarat) |
674 |
373 |
86 |
|
26 |
34 |
Sirhind
feeder (Punjab) |
670 |
10 |
@ |
@ |
@ |
35 |
Sone
project (Bihar) |
2069 |
1200 |
307 |
50 |
150 |
36 |
Tawa**
(Madhya Pradesh) |
2184 |
1000 |
787 |
|
25 |
37 |
Tungabhadra**
(Andhra Pradesh and Mysore) |
4453 |
513 |
843 |
365 |
815 |
38 |
Tungabhadra
high level canal (Stage I) (Andhra Pradesh and Mysore) |
1300 |
1040 |
187 |
|
168 |
39 |
Ukai
project** (Gujarat) |
2897 |
700 |
392 |
|
|
40 |
Vir
dam (Maharashtra) |
541 |
278 |
66 |
|
61 |
41 |
Western
Jammu Canal Remodelling (Punjab) |
534 |
150 |
555 |
354 |
555 |
* Includes estimated cost of Hirakud Stage
I (Power).; ** Multipurpose project.; @ it is a new scheme of III Plan
so far as U.P. is concerned.
ANNEXURE V New
multipurpose and major irrigation schemes
of Third Plan (referred to in paragraph 16)
|
name
of scheme |
total
cost (irrigation portion only) (Rs. lakhs) |
outlay
for Third Plan (Rs. lakhs) |
utilisation
('000 acres) gross area |
on
completion |
to
end of Third Plan |
|
1 |
2 |
3 |
4 |
5 |
1 |
Beas**
(Punjab and Rajasthan) |
11743 |
3700
|
2630 |
|
2 |
Bhima
lift irrigation scheme (Maharashtra) |
946 |
78 |
100 |
|
3 |
Biragobindpur
(Orissa) |
507 |
150 |
178 |
|
4 |
Damodar
Valley** (West Bengal) |
664 |
575 |
* |
* |
5 |
Harangi
and/or
Kambadakada (Mysore) |
1050
170 |
200 |
105 |
|
6 |
Hasdeo**
(Madhya Pradesh) |
1600 |
150 |
300 |
|
7 |
Kallada
(Kerala) |
840 |
150 |
107 |
|
8 |
Kosi
western canal and extension in easterm canals (Bihar) |
1700 |
450 |
1149 |
150 |
9 |
Koyna
irrigation scheme (Maharashtra) |
950 |
275 |
93 |
|
10 |
Malaprabha
(Mysore) |
2000 |
300 |
500 |
|
11 |
Sarju
canal (Uttar Pradesh) |
1078 |
200 |
418 |
|
12 |
Vamsadhara
and/or
Pochampad (Andhra Pradesh) |
1450
1525 |
400 |
357
360 |
115 |
*Extension and improvement works.
** Multipurpose project.
Note :The question of inclusion of Upper Krishna Project (Mysore)
in the Third Plan is under consideration.
ANNEXURE VI Growth
of installed generating capacity and generation
during First and Second Plans (referred to in paragraph 44)
particulars |
1950* |
1955* |
%increase
over 1950 (First Plan) |
1960-61**
(estimate) |
%increase
over 1955 (Second Plan) |
A
utilities (public and private) |
1
hydroplant |
(i)
installed generating capacity in MW |
559-3 |
939-5 |
68-0 |
1932-0 |
106 |
(ii)
electricity generated (in million kWh) |
2519-8 |
3742
-2 |
49-0 |
7850
-0 |
110 |
(iii)
kWh generated per kW of installed generating capacity . |
4510 |
4000 |
|
4070 |
|
2
steam plant |
(i)
installed generating capacity in MW |
1004-4 |
1546-9 |
54-0 |
2439
-0 |
57-7 |
(ii)
electricity generated (in million kWh) |
2387
-2 |
4618
-9 |
93-3 |
8790
-0 |
90-5 |
(iii)
kWh generated per kW of installed generating capacity . |
2380 |
3000 |
|
3600 |
|
3
oilplant |
(i)
installed generating capacity in MW |
148-8 |
208-5 |
40-2 |
310-6 |
49-0 |
(ii)
electricity generated (in million kWh) |
199-7 |
231-3 |
15-9 |
360-0 |
55-7 |
(iii)
kWh generated per kW of installed generating capacity |
1340 |
1110 |
|
1160 |
|
B.
self-generating industrial establishments |
(i)
installed generating capacity in MW |
587-8 |
723-5 |
23-1 |
1015
-0 |
40-3 |
(ii)
electricity generated (in million kWh) |
1467
-8 |
2184-8 |
49-0 |
2850
-0 |
30-5 |
(iii)
kWh generated per kW of installed generating capacity . |
2500 |
3040 |
|
2810 |
|
total
(A +B) |
(i)
installed generating capacity in MW |
2300
-3 |
3418-3 |
48-5 |
5696-6 |
66-6 |
(ii)
electricity generated (in million kWh) |
6574-5 |
10777-2 |
64-0 |
19850-0 |
84-2 |
(iii)
kWh generated per kW of installed generating capacity . |
2860 |
3140 |
|
3490 |
|
* Figures relate to calendar year.
**Figures relate to 1st April, 196031st March, 1961.
Note : Installed generating capacity
is given as at the end of the year and ttr figurw for electricity generation
for the year.
ANNEXURE VII Principal
power stations commissioned during the First and Second Plans
(referred to in paragraph 44)
|
name of the
scheme |
installed capacity
commissioned in kW. |
|
plant
commissioned during First Plan |
1 |
Nizamsagar hydro-electric
scheme (Andhra Pradesh) |
15000 |
2 |
Machkund hydro-electric
project (Andhra Pradesh and Orissa) |
34000 |
3 |
Sindri thermal
station (Bihar) |
80000 |
4 |
Bokaro thermal
station (D.V.C.) |
172500 |
5 |
Utran thermal
station (Gujarat) |
22500 |
6 |
Ahmedabad electric
supply extension (private sector-Gujarat) |
60000 |
7 |
Sengulam power
station (Kerala) |
48000 |
8 |
Chandni thermal
station (Madhya Pradesh) |
17000 |
9 |
Indorc thermal
station extension (Madhya Pradesh) |
13000 |
10 |
Moyur power
house (Madras) |
36000 |
11 |
Pykara power
house (Madras) |
27200 |
12 |
Madras plant
extensions (Madras) |
30000 |
13 |
Khaperkheda
thermal station (Maharashtra) |
30000 |
14 |
Chola power
station (Maharashtra) |
78000 |
15 |
Ballarshah thermal
station (Maharashtra) |
7750 |
16 |
Bhira hydro-electric
scheme (Maharashtra) |
22000 |
17 |
Jog power station
(Mysore) |
72000 |
18 |
Nangal power
house (Punjab) |
48000 |
19 |
Kanpur thermal
station (Uttar Pradesh) |
15000 |
20 |
Pathri hydro-electric
scheme (Uttar Pradesh) |
20400 |
21 |
Sarda hydro-electric
scheme (Uttar Pradesh) . |
41400 |
22 |
Calcutta electric
supply corporation extension (West Bengal) |
30000 |
23 |
Delhi thermal
station (Delhi) |
20000 |
|
plant commissioned during
Second Plan
|
|
Plant Commissioned During Second Plan
1 |
Machkund
hydro-electric scheme (Andhra Pradesh and Orissa) |
81000 |
2 |
Tungabhadra
hydro-electric project (Andhra Pradesh and Mysore) |
36000 |
3 |
Ramagundam
thermal station (Andhra Pradesh) |
37500 |
4 |
Umtru
hydro-electric scheme (Assam) |
8400 |
5 |
Maithon
hydro-electric scheme (D.V.C.) |
60000 |
6 |
Panchet
hydro-electric scheme (D.V.C.) |
40000 |
7 |
Bokaro
thermal station extension (D.V.C.) |
82500 |
8 |
Durgapur
thermal station (D.V.C.) |
165000 |
9 |
Ahmedabad
thermal station extension (private sectorGujarat) |
15000 |
10 |
Utran
thermal station (Gujarat) |
45000 |
11 |
Poringalkuthu
hydro-electric project (Kerala) |
32000 |
12 |
Neriamangalam
hydro-electric project (Kerala) |
45000 |
13 |
Korba
thermal station (Madhya Pradesh) |
90000 |
14 |
Gandhisagar
dam power station (Madhya Pradesh and Rajasthan) |
69000 |
15 |
Bhilai
steel plant power station (Madhya Pradesh) |
25000 |
16 |
Madras
thermal station extension (Madras) |
30000 |
17 |
Periyar
hydro-electric project (Madras) |
105000 |
18 |
Kundah
hydro-electric project (Madras) |
145000 |
19 |
Trombay
thermal station (private sectorMaharashtra) |
187500 |
20 |
Akola
(Paras) thermal station (Maharashtra) |
30000 |
21 |
Ballarshah
thermal station (Maharashtra) |
15500 |
22 |
Khaperkheda
thermal station extension (Maharashtra) |
30000 |
23 |
Tungabhadra
left bank power house (Mysore) |
9000 |
24 |
Hirakud
hydro-electric project (Orissa) |
123000 |
25 |
Rourkela
steel plant power station (Orissa) |
75000 |
26 |
Bhakra-Nangal
project (Punjab and Rajasthan) |
207000 |
27 |
Kanpur
thermal station extension (Uttar Pradesh) |
15000 |
28 |
Eastern
area power stations (Uttar Pradesh) |
45000 |
29 |
Durgapur
coke-oven plant thermal station (West Bengal) |
60000 |
30
: |
Indian
Iron and Steel Co., power station (Burnpur) (West Bengal) |
20000 |
ANNEXURE VIII Principal
generation schemes included in the Third Plan with benefit potential
(referred to in paragraph 48)
name of the
scheme |
total installed
capacity inKW |
continuing
schemes |
1 Thugabhadra
hydro-electric project stage II (Andhra Pradesh and Mysore) |
36000 |
2 Nellore thermal
station (Andhra Pradesh) |
30000 |
3 Upper Silern
hydro-electric project (Andhra Pradesh) |
120000 |
4 Umiam hydro-electric
project stage I (Assam) |
36000 |
5 Barauni thermal
station (Bihar) |
30000 |
6 Pathratu thermal
station (Bihar) |
100000 |
7 Chandrapura
thermal station (D.V.C.) |
280000 |
8 Ahmedabad
thermal station extension (private sector-Gujarat) |
30000 |
9 Panniar hydro-electric
project (Kerala) |
30000 |
10 Sholayar
hydro-electric project (Kerala) |
54000 |
11 Gandhisagar
dam power station IV unit (Madhya Pradesh and Raj asthan) |
23000 |
12 Amarkantak
thermal station (Madhya Pradesh) |
60000 |
13 Neiveli lignite
power station (Madras) |
250000 |
14 Kundah hydro-electric
project (Madras) |
35000 |
15 Koyana hydro-electric
project stage I (Maharashtra) |
240000 |
16 Puma hydro-electric
project (Maharashtra) |
150QO |
17 Bhadra hydro-electric
project (Mysore) . |
33200 |
18 Tungabhadra
left bank power house (Mysore) |
18000 |
19 Sharavathy
hydro-electric project stage I (Mysore) |
178200 |
20 Hirakud hydro
electric project (Orissa) |
147000 |
21 Bhakra-Nangal
project (Punjab and Rajasthan) |
164000 |
22 Rana Pratapsagar
dam power house (Rajasthan and Madhya Pradesh) |
128000 |
23 Riband hydro-electric
project (Uttar Pradesh) |
250000 |
24 Kanpur thermal
station extension (Uttar Pradesh) |
15000 |
25 Harduaganj
thermal station (Uttar Pradesh) |
60000 |
26 Matatila
hydro-electric project (Uttar Pradesh) |
30000 |
27 Yamuna hydro-electric
project (Uttar Pradesh) |
320000 |
28 Ramganga
hydro-electric project (Uttar Pradesh) |
127500 |
29 Jaldhaka
hydro-electric project (West Bengal) |
18000 |
30 Durgapur
coke-oven plant power house extension (West Bengal) |
150000 |
31 Delhi thermal
station extension (Delhi) |
30000 |
new
schemes |
1 Kothagudem
thermal station (Andhra Pradesh) |
120000 |
2 Ramagundam
thermal station extension (Andhra Pradesh) |
60000 |
3 Nagarjunasagar
hydro-electric project (Andhra Pradesh) |
100000 |
4 Srisailam
hydro-electric project (Andhra Pradesh) |
330000 |
5 Nahorkatiya
thermal station (Assam) |
67200 |
6 Umiam hydro-electric
project stage II (Assam) |
65000 |
7 Barauni thermal
station extension (Bihar) |
75000 |
8 Pathratu thermal
station extension (Bihar) |
250000 |
9 Thermal extensions
in D.V.C. area (D.V.C.) |
280000 |
10 Gandak hydro-electric
project (Bihar) |
15000 |
11 Kosi hydro-electric
project (Bihar) |
20000 |
12 Ahmedabad
thermal station extension (private sectorGujarat) |
30000 |
13 Dhuvaran
(Chambay) thermal station (Gujarat) |
200000 |
14 Chenani hydro-electric
project (Jammu and Kashmir) |
15000 |
15 Jhelum hydro-electric
project (Jammu and Kashmir) |
27000 |
16 Salal hydro-electric
project (Jammu and Kashmir) |
60000 |
17 Sabarigiri
(Pamba) hydro-electric project (Kerala) |
300000 |
18 Idikki hydro-electric
project (Kerala) |
390000 |
19 |
Kuttiadi
hydro-electric project (Kerala) |
45000 |
20 |
Korba
thermal station extension (Madhya Pradesh) |
200000 |
21 |
Satpura
thermal station (Madhya Pradesh) |
180000 |
22 |
Tawa
hydro-electric project (Madhya Pradesh) |
42000 |
23 |
Punasa
hydro-electric project (Madhya Pradesh and Gujarat) |
576000 |
24 |
Kundah
hydro-electric project (Madras) |
240000 |
25 |
Mettur
tunnel hydro-electric project (Madras) |
100000 |
26 |
Periyar
hydro-electric station extension (Madras) |
35000 |
27 |
Neiveli
lignite power station extension (Madras) |
150000 |
28 |
Parambikulam
hydro-electric project (Madras) |
180000 |
29 |
Koyna
hydro-electric project stage II (Maharashtra) |
300000 |
30 |
Khaperkheda
thermal station extension (Maharashtra) |
60000 |
31 |
Akola
(paras) thermal station extension (Maharashtra) |
60000 |
32 |
Bhusawal
thermal station (Maharashtra) |
60000 |
33 |
Nuclear
power station (Maharashtra and Gujarat) |
300000 |
34 |
Vaitarna
hydro-electric project (Maharashtra) |
45000 |
35 |
Sharavathy
hydro-electric project stage II (Mysore) |
534600 |
36 |
Sharavathy
tail race development (Mysore) |
145000 |
37 |
Taleher
thermal station (Orissa) |
240000 |
38 |
Balimela/Guntawada
hydro-electric scheme (Orissa and Andhra Pradesh) |
240000 |
39 |
Bhakra
right bank power house (Punjab and Rajasthan) |
280000 |
40 |
Uhl
river hydro-electric project stage 11 (Punjab) |
40000 |
41 |
Upper
Bari-Doab canal project (Punjab) |
22000 |
42 |
Beas
project stage I (Punjab and Rajasthan) |
240000 |
43 |
Thermal
extensions (Rajasthan) |
90000 |
44 |
Kotah
hydro-electric project (Rajasthan and Madhya Pradesh) |
78000 |
45 |
Harduaganj
thermal station extension (Uttar Pradesh) |
30000 |
46 |
Singrauli
thermal station (Uttar Pradesh) |
250000 |
47 |
Obra
hydro-electric project (Uttar Pradesh) |
80000 |
48 |
Bandel
thermal station (West Bangal) |
300000 |
49 |
Delhi
thermal station extension (Delhi and Punjab) |
180000 |
ANNEXURE IX powercost
and benefits by States in Third PlanState-owned utilities
(referred to in paragraph 48)
|
name
of the State - |
outlay
Rs. in lakhs |
benefits
in MW |
continuing
schemes |
new
schemes |
total |
during
Third Plan |
1966-67
first year of the Fourth Plan |
beyond
1966-67 |
from
continuing schemes |
from
new schemes |
total |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
1 |
Andhra
Pradesh |
1934.0 |
4560.0 |
6494.0 |
178.8 |
180.0 |
358.8 |
100.0 |
510.0 |
2 |
Assam
|
550.0 |
2200.0 |
2750.0 |
31.0 |
96.2 |
127.2 |
25.0 |
25.0 |
3 |
Biharf
|
1535.0 |
4023.0 |
5558.0 |
130.0 |
245.0 |
375.0 |
95.0 |
20.0 |
4 |
Gujarat* |
50.0 |
4598.0 |
4648.0 |
18.0 |
250.0 |
268.0 |
|
288.0 |
5 |
Jammu
and Kashmir |
127.0 |
870.0 |
997.0 |
14.8 |
20.0 |
34.8 |
23.0 |
69.0 |
6 |
Kerala |
2676.0 |
1680.0 |
4356.0 |
334.0 |
|
334.0 |
50.0 |
435.0 |
7 |
Madhya
Pradesh |
2309.0 |
5291.0 |
7600.0 |
145.5 |
281.5 |
427.0 |
89.0 |
390:0 |
8 |
Madras
% |
319.0 |
9700.0 |
10019.0 |
35.0 |
335.0 |
370.0 |
220.0 |
|
9 |
Maharashtra* |
1674.0 |
6450.0 |
8124.0 |
255.0 |
405.0 |
660.0 |
120.0 |
|
10 |
Mysore
|
3070.0 |
3897.0 |
6967.0 |
236.6 |
356.4 |
593.0 |
178.2 |
735.0 |
11 |
Orissa
|
657.0 |
3805.0 |
4462.0 |
147.0 |
180.0 |
327.0 |
60.0 |
240.0 |
12 |
Punjab
|
718.0 |
6046.0 |
6764.0 |
139.4 |
363.0 |
502.4 |
22.0 |
1240.0 |
13 |
Rajasthan |
765.0 |
2735.0 |
3500.0 |
103.1 |
153.5 |
256.6 |
39.0 |
|
14 |
Uttar
Pradesh |
4640.0 |
6196.0 |
10836.0 |
415.0 |
230.0 |
645.0 |
50.0 |
471
5 |
15 |
West
Bengal# |
1367.0 |
2340.0@ |
3707.O@ |
168.0 |
300.0 |
468.0 |
|
9.0 |
16 |
Damodar
Valley Corporation** |
2974.0 |
3039.0 |
6013.0 |
280.0 |
140.0 |
420.0 |
140.0 |
|
|
total |
25365.0 |
67430.0 |
92795.0 |
2631.2 |
3535.6 |
6166.8 |
1211.2 |
4432.5 |
Union
Territories |
1 |
Delhi |
300-00 |
1490
-00 |
1790
-00 |
30-0 |
135-0 |
165-0 |
|
|
2 |
Himachal
Pradesh |
78-00 |
119-00 |
197
-00 |
|
2-0 |
2-0 |
|
|
3 |
Tripura |
1-87 |
71-13 |
73-00 |
|
0-5 |
0-5 |
|
|
4 |
Manipur |
5-50 |
101
-08 |
106
-58 |
|
2-8 |
2-8 |
|
|
5 |
Pondicherry
|
3-10 |
65-47 |
68-57 |
|
|
|
|
|
6 |
Andaman
and Nicobar Islands |
4
-25 |
10-10 |
14-35 |
|
|
|
|
|
7 |
Laccadive
Minicoy and Amindive Islands |
1.50 |
3-76 |
5-26 |
|
|
|
|
|
8 |
N.E.F.A. |
16-57 |
43-43 |
60-00 |
1-0 |
1-5 |
2-5 |
|
|
9 |
N.H.T.A. |
9-50 |
20-50 |
30-00 |
0-5 |
0-5 |
1-0 |
|
|
|
total
of Union territories |
420
-29 |
1924
-47 |
2344
-76 |
31-5 |
142-3 |
173-8 |
|
|
|
grand
total |
25785.29
|
69354.47
|
95139-76 |
2662-7 |
3677
-9 |
6340-6
|
1211-2 |
4432-5 |
# Excludcs outlay and benefits of D.V.C.
%Excludes outlay and benefits of Neiveli power station.
*Exeludes outlay and benefits of Nuclear power station.
**Includcs Centre's share.
@This is provisional and is subject to adjustment on account of increase
in resources estimated at Rs. 4300 lakhs which the State Government expect
to raise above the level of Rs. 9000 lakhs shown in Chapter VIFinancial
Resources.
NoteShare of States from
joint projects shown in the benefits for respective States.
ANNEXURE X
Pattern of electricity consumptionall-India 1951-1961
(including generation in self-generating industrial establishment) (referred
to in oaraeraDh 57)
|
class
of utilisation |
1951 |
1952 |
1953 |
1954 |
million
kWh |
%of
total |
million
kWh |
%of
total |
million
kWh |
%of
total |
million
kWh |
%of
total |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
1 |
domestic
or residential light and small power |
595.005 |
7.9 |
628.882 |
7.9 |
690.516 |
8.0 |
759.169 |
7.9 |
2 |
commercial
light and small power |
331
-533 |
4-4 |
336.628 |
4'3 |
399-107 |
4-6 |
446-156 |
4.6 |
3 |
industrial
power* |
4609.754 |
61.4 |
4908.222 |
61.4 |
5411.388 |
62-3 |
6002.887 |
62.9 |
4 |
traction |
329.594
|
4.4 |
324.750 |
4.1 |
358.317 |
4.1 |
378.411 |
3.9 |
5 |
public
lighting |
67.917 |
0.9 |
73-942 |
0-9 |
81-445 |
0-9 |
93.938 |
1.0 |
6 |
irrigation |
203.048 |
2.7 |
215.192 |
2.7 |
214.138 |
2.5 |
231.373 |
2.5 |
7 |
Public
water works and sewage pumping |
211.583 |
2.8 |
219.764 |
2.7 |
240.374 |
2.8 |
267.471 |
2.8 |
8 |
consumption
of auxiliaries. transmission losses etc. (including 5 % of generation
in self generating industrial establishments) |
1165.537 |
15.5 |
1296.544 |
16.1 |
1285.811 |
14.8 |
1397.008 |
14.4 |
9 |
total
generation** . |
7513-971
|
100.0 |
8003.924 |
100.0 |
8681.096 |
100.0 |
9576.413 |
100.0 |
|
classes
of Utilisation |
1955 |
1956 |
1957-58 |
million
kWh |
%
of total |
million
kWh |
%
of Total |
million
kWh |
%of
total |
|
(1) |
(10) |
(11) |
(12) |
(13) |
(14) |
(15) |
1 |
domestic
or residential} light and small power |
850.426 |
7-9 |
934
-122 |
7-9 |
1094-564 |
8.0 |
2 |
eommecrial
light and small power |
514
-423 |
4-8 |
545
-853 |
4-6 |
611-512 |
4.5 |
3 |
industrial
power* |
6757
-063 |
62-6 |
7403
-858 |
62.5 |
8362
-737 |
61.3 |
4 |
traction |
403
-302 |
3-7 |
404-925 |
3-4 |
421
-894 |
3-1 |
5 |
public
lighting |
105
-631 |
1-0 |
117-767 |
1-0 |
141-402 |
1.0 |
6 |
irrigation
|
254
-803 |
2-4 |
316-178 |
2-7 |
565
-817 |
4-1 |
7 |
public
water works and sewage pumping |
284
-637 |
2-6 |
317-076 |
2-7 |
365
-649 |
2-7 |
8 |
consumption
of auxiliaries, transmission losses etc. (including 5% of generation
in self-generating industrial establishments) |
1606-981 |
15-9 |
1831-863 |
15-2 |
2093
-857 |
15.3 |
9 |
total
generation** |
10777-266 |
100.0 |
11871-642 |
100-0 |
13675-432 |
100.0 |
|
class
of utilisation |
1958-59 |
1959-60 |
1960-61(estimatc) |
million
kWh |
%of
total |
million
kWh |
%of
total |
million
kWh |
%of
total |
|
|
(16) |
(17) |
(18) |
(19) |
(20) |
(21) |
1 |
domestic
or residential light and small power |
1238.044 |
8.0 |
1368.884 |
7.7 |
1492.0 |
7.5 |
2 |
commercial
light and small power |
682.818 |
4.5 |
758.988 |
4.3 |
870.0 |
4.4 |
3 |
industrial
power* |
9488.486 |
61.5 |
11015.074 |
62.0 |
12313.5 |
62.0 |
4 |
traction
|
441.549 |
2.9 |
440.594 |
2.5 |
449.0 |
2.3 |
5 |
public
lighting |
156.066 |
1.0 |
175.420 |
1.0 |
192.0 |
1.0 |
6 |
irrigation
|
583.482 |
3.8 |
727.026 |
4.1 |
836.0 |
4.2 |
7 |
public
water works and sewage pumping |
392.617 |
2.6 |
430.845 |
2.4 |
455.0 |
2.3 |
8 |
consumption
of auxiliaries, transmission losses etc (including 5% of generation
in self generating industrial establishments) |
2431.507 |
15.7 |
2835.547 |
16.0 |
3242.5 |
16.3 |
9 |
total
generation** |
15414-569 |
100.0 |
17752-378 |
100-00 |
19850
-0 |
100-0 |
* In the absence of precise data, 5 per
cent of generation in self-generating industrial establishments is assumed
as losses.
** Includes generation from self-generating industrial establishments.
ANNEXURE XI Sector-wise
growth of electricity consumption during First and Second Plans
(including generation in self-generating industrial establishments) (referred
to in paragraph 57)
|
class
if utilisation |
1950*
million kWh |
1955*
million kWh |
%
increase over 1950 (First Plan) |
1960-61
** (estimate) million kWh |
%increase
over 195S (Second Plan) |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
1 |
domestic
or residential light and small power |
524.6 |
850.4 |
62.0 |
1492.0 |
75.5 |
2 |
commercial
light and small power |
308.8 |
514.4 |
65.5 |
870.0 |
69.3 |
3 |
industrial
power # |
3983.6 |
6757.1 |
92.5 |
32313.5 |
82.5 |
4 |
traction
|
308.4 |
403.3 |
30.8 |
449.0 |
11.3 |
5 |
public
lighting |
60.5 |
105.6 |
75.0 |
192.0 |
82.0 |
6 |
irrigation
|
161.7 |
254.8 |
57.6 |
836.0 |
228.0 |
7 |
public
water works and sewage pumping |
189.1 |
284.6 |
50.5 |
455.0 |
60.0 |
8 |
consumption
of auxiliaries, transmission losses, etc. (including 5 % of generation
in self-generating industrial establishments) |
1038.0 |
1607.0 |
55.0 |
3242.5 |
102.0 |
9 |
total
generation |
6574.5 |
10777.2 |
64.0 |
19850.0 |
84.3 |
* Figures relate to calendar year.
** Figures relate to 1st April, 1960 to 31st March, 1961.
# Includes 95 per cent of generation from self-generating industrial establishments
as in the absence of precise data, 5 per cent of generation in self-generating
industrial establishments is assumed as losses.
|