IRRIGATION AND POWER

ANNEXURE I Abstract of benefits anticipated from major and medium irrigation projects
(referred to in paragraphs 8 and 11)
('000crores) gross area

State irrigation on full develop- ment from First and Second Plan schemes First and Second Plan Schemes new schemes of Third Plan total from continuing schemes and new schemes of Third Plan to end of Third Plan additional
benefits inThird Plan
potential created to end of Second Plan utilisation to end of Second Plan potential to end of Third plan utilisation to end of Third Plan potential to end of Third Plan utilisation to end of Third Plan potential (col. 5+ (7) utilisation (col. 6+ (8)

potential (col. 9-3)

utilis-
ation (col. 10-4)
1 2 3 4 5 6 7 8 9 10 11 12
1 Andhra Pradesh 3720 830 736 3361 2159 134 134 3495 2293 2655 1557
2 Assam 88 79 88 79 88 79
3 Bihar 5569 915 720 3192 2402 482 318 3674 2720 2759 2003
4 Gujarat 3809 640 227 1716 1091 1716 1091 1076 864
5 Jammii and Kashmir 163 5 5 55 32 11 11 66 43 61 38
6 Kerala 555 358 358 527 527 86 86 613 613 255 255
7 Madhya Pradesh 2242 95 75 1365 905 40 20 1405 925 1310 853
8 Madras 890 611 581 791 789 33 33 824 822 213 241
9 Maharashtra 1248 233 105 999 713 353 100 1352 813 1119 733
10 Mysore 1480 707 324 1348 1173 52 27 1403 1233 693 876
11 Orissa 2615 1000 720 2287 1666 2287 1655 1237 91.5
12 Punjab 4351 3307 2957 4157 4058 200 200 4357 4258 1050 1331
13 Rajasthan 3666 734 618 2357 1754 25 9 2332 1753 1613 1145
14 Uttar Pradesh 4262 2118 1479 2800 2423 912 98 3712 2521 1591 1342
15 West Bengal 2990 1690 1084 2051 1936 32 32 2103 1953 413 834
total 37560 13243 9989 27026 21628 2448 1147 29474 22775 16231 12786

Additional utilisation in Third Plan form the continuing schemes of First and Second Plans (col. 6 col. 4)==11,639,000 acres.

ANNEXURE II Abstract of estimated cost of major and medium irrigation projects
and outlays on them in the Third Plan (referred to in paragraph12)
(Rs. Lakhs)

State estimated cost of First and Second Plan schemes schemes continuing from First and Second Plans in to Third Plan new schemes of Third Plan total provision in Third Plan for continuing and new schemes (col.5+ col. 7)
estimated cost carry-over from Second Plan outlay for Third Plan estimated cost outlay in Third Plan
1 2 3 4 5 6 7 8
1 Andhia Pradesh 16536 13941 6745 6548 1842 832 7380
2 Assam 170 277 228 228
3 Bihar 10743 9094 7118 4712 3144 1445 6157
4 Gujant 17411 17267 12098 5014 110 110 5124
5 Jammu and Kashmir 1529 1285 1141 556 130 44 600
6 Kerala 2635 2262 378 378 2150 764 1142
7 Madhya Pradesh 8860 8402 5097 3600 2364 560 4160
8 Madras 6086 4602 2150 2i50 689 592 2742
9 Maharashtra 10438 10360 6637 5034 3174 1570 6604
10 Mysore 10853 10328 3897 3341 3757 725 4066
11 Orissa 10226 * 10184* 2657 1911 807 230 2141
12 Punjab 11424 10193 1348 904 4882 1300 2204
13 Rajasthan 14074 13987 8069 5770 6450 2740 8510
14 Uttar Pradesh 8966 6938 4109 2422 4024 2749 5171
15 West Bengal 8407 8104 2646 1206 749 686 1892
16 Union Territories 10 10 10 10 10
17 Central Schemes 1803 @ 1803@ 1803 @
total 138368 126957 64100 43556 36352 16378 59934

* Includes cost of Hirakud Stage I (Power portion). includes Rs. 1000 lakhs for supplying water to Bokaro Steel Plant and other industries.

ANNEXURE III Abstract of estimated cost and outlays on flood-control, drainage,
anfi-waterlogging and anti-sea-erosion schemes (referred to in paragraph 12)
(Rs. lakhs)

State schemes continuing from First and Second Plans into Third Plan
new schemes of Third Plan
total provision in Third Plan for continuing and new schemes (col. 4+ col. 6)
estimated cost carry-over from Second Plan outlay for Third Plan estimated
cost

outlay in Third Plan
1 2 3 4 5 6 7
1 Andhra Pradesh 195 35 35 210 208 243
2 Assam 436 115 115 507 385 500
3 Bihar 2532 700 700 291 200 900
4 Gujarat 60 50 50 50
5 Jammu and Kashmir 1060 855 855 45 45 900
6 Kerala 302 71 71 431 350 421
7 Madhya Pradesh 235 9 9 11 11 20
8 Madras
9 Maharashtra 30 30 30
10 Mysore
11 Orissa 74 48 48 300 202 250
12 Punjab 770 432 432 2216 1069 1501
13 Rajasthan 110 90 90 90
14 Uttar Pradesh 568 56 56 602 519 575
15 West Bengal 2305 84 84 847 431 515
16 Union Territories 79 69 69 164 68 137
total 8726 2614 2614 5654 3518 6132

ANNEXURE IV Multipurpose and major irrigation schemes—continuing from First and
Second Plans into Third Plan (referred to in paragraph 16)

name of scheme and State total cost (irrigation portion only) (Rs. lakhs) outlay for Third plan (Rs. lakhs) utilisation ('ooo acres) gross area
on completion to end of Second Plan to end of Third Plan
1 2 3 4 5 6
1 Bagh (Maharashtra) 610 120 60 2
2 Banas (Gujarat) 827 605 110 59
3 Banas (Rajasthan) 776 150 200
4 Bama (Madhya Pradesh) 552 200 173
5 Bhadra** (Mysore) 3193 1310 245 32 182
6 Bhakra Nangal** (Punjab and Rajasthan) 10189 419 3604 2550 3604
7 Chambal (Stage I and II) (Rajasthan and Madhya Pradesh) 5485 1703 1400 60 800
8 Damodar Valley** (West Bengal) 3468 116 1273 610 1023
9 Gandak** (Bihar and Uttar Pradesh) 4945 3000 3138 300
10 Ghataprabha left bank canal (Stage I and II) (Mysore) 1863 572 298 53 180
11 Girna (Maharashtra) 865 519 143 116
12 Hirakud **(Stage I) including Mahanadi Delta (Orissa) 9334* 1200 2158 710 1337
13 Itiadoh (Maharashtra) 692 200 75 1
14 Kadam (Andhra Pradesh) 601 90 75 25 75
15 Kakrapar canal (Lower Tapi) (Gujarat) 1870 400 562 50 296
16 Kangasabati project (West Bengal) . 2526 807 950 250
17 K.C. canal (Andhra Pradesh) 659 100 1W 346 230 346
18 Khadakwasia (Maharashtra) 1055 596 43 43
19 Kosi (Bihar) 2482 1200 1397 900
20 Mahi (Stage I and 11) (Gujarat and Rajasthan) 4178 876 751 29 214
21 Malampuzha (Kerala) 532 31 109 95 109
22 Matatila dam (Uttar Pradesh) . 1283 272 413 220 370
23 Mayurakshi (West Bengal) 2105 210 720 462 580
24 Mula (Maharashtra) 1500 600 162 * * 8
25 Nagarjunasagar**
(Andhra Pradesh) .
9112 5000 2060 900
26 Narmada (Broach)
(Gujarat)
4309 1200 963
27 Parambikulam project** (Madras) 2487 2112 240 150
28 Puma (Maharashtra) 1284 861 152 94
29 Rajasthan canal (Rajasthan) 6647 3800 1684 284
30 Ramganga project* *
(Uttar Pradesh)
3455 1600 1705 175
31 Ujh dam or Tawi project (Jammu and Kashmir) 900 332 62
32 Sarda sagar (Stage II)
(Uttar Pradesh)
636 169 185 40 105
33 Shetrunji (Gujarat) 674 373 86 26
34 Sirhind feeder (Punjab) 670 10 @ @ @
35 Sone project (Bihar) 2069 1200 307 50 150
36 Tawa** (Madhya Pradesh) 2184 1000 787 25
37 Tungabhadra**
(Andhra Pradesh and Mysore)
4453 513 843 365 815
38 Tungabhadra high level canal (Stage I) (Andhra Pradesh and Mysore) 1300 1040 187 168
39 Ukai project** (Gujarat) 2897 700 392
40 Vir dam (Maharashtra) 541 278 66 61
41 Western Jammu Canal Remodelling (Punjab) 534 150 555 354 555

* Includes estimated cost of Hirakud Stage I (Power).; ** Multipurpose project.; @ it is a new scheme of III Plan so far as U.P. is concerned.

ANNEXURE V New multipurpose and major irrigation schemes
of Third Plan (referred to in paragraph 16)

name of scheme total cost (irrigation portion only) (Rs. lakhs) outlay for Third Plan (Rs. lakhs) utilisation ('000 acres) gross area
on completion to end of Third Plan
1 2 3 4 5
1 Beas** (Punjab and Rajasthan) 11743 3700 2630
2 Bhima lift irrigation scheme (Maharashtra) 946 78 100
3 Biragobindpur (Orissa) 507 150 178
4 Damodar Valley** (West Bengal) 664 575 * *
5 Harangi and/or
Kambadakada (Mysore)
1050
170
200 105
6 Hasdeo** (Madhya Pradesh) 1600 150 300
7 Kallada (Kerala) 840 150 107
8 Kosi western canal and extension in easterm canals (Bihar) 1700 450 1149 150
9 Koyna irrigation scheme (Maharashtra) 950 275 93
10 Malaprabha (Mysore) 2000 300 500
11 Sarju canal (Uttar Pradesh) 1078 200 418
12 Vamsadhara and/or
Pochampad (Andhra Pradesh)
1450
1525
400 357
360
115

*Extension and improvement works.
** Multipurpose project.
Note :—The question of inclusion of Upper Krishna Project (Mysore) in the Third Plan is under consideration.

ANNEXURE VI Growth of installed generating capacity and generation
during First and Second Plans (referred to in paragraph 44)

particulars 1950* 1955* %increase over 1950 (First Plan) 1960-61** (estimate) %increase over 1955 (Second Plan)
A utilities (public and private)
1 hydroplant
(i) installed generating capacity in MW 559-3 939-5 68-0 1932-0 106
(ii) electricity generated (in million kWh) 2519-8 3742 -2 49-0 7850 -0 110
(iii) kWh generated per kW of installed generating capacity . 4510 4000 4070
2 steam plant
(i) installed generating capacity in MW 1004-4 1546-9 54-0 2439 -0 57-7
(ii) electricity generated (in million kWh) 2387 -2 4618 -9 93-3 8790 -0 90-5
(iii) kWh generated per kW of installed generating capacity . 2380 3000 3600
3 oilplant
(i) installed generating capacity in MW 148-8 208-5 40-2 310-6 49-0
(ii) electricity generated (in million kWh) 199-7 231-3 15-9 360-0 55-7
(iii) kWh generated per kW of installed generating capacity 1340 1110 1160
B. self-generating industrial establishments
(i) installed generating capacity in MW 587-8 723-5 23-1 1015 -0 40-3
(ii) electricity generated (in million kWh) 1467 -8 2184-8 49-0 2850 -0 30-5
(iii) kWh generated per kW of installed generating capacity . 2500 3040 2810
total (A +B)
(i) installed generating capacity in MW 2300 -3 3418-3 48-5 5696-6 66-6
(ii) electricity generated (in million kWh) 6574-5 10777-2 64-0 19850-0 84-2
(iii) kWh generated per kW of installed generating capacity . 2860 3140 3490

* Figures relate to calendar year.
**Figures relate to 1st April, 1960—31st March, 1961.

Note :— Installed generating capacity is given as at the end of the year and ttr figurw for electricity generation for the year.

ANNEXURE VII Principal power stations commissioned during the First and Second Plans
(referred to in paragraph 44)

name of the scheme installed capacity commissioned in kW.
plant commissioned during First Plan
1 Nizamsagar hydro-electric scheme (Andhra Pradesh) 15000
2 Machkund hydro-electric project (Andhra Pradesh and Orissa) 34000
3 Sindri thermal station (Bihar) 80000
4 Bokaro thermal station (D.V.C.) 172500
5 Utran thermal station (Gujarat) 22500
6 Ahmedabad electric supply extension (private sector-Gujarat) 60000
7 Sengulam power station (Kerala) 48000
8 Chandni thermal station (Madhya Pradesh) 17000
9 Indorc thermal station extension (Madhya Pradesh) 13000
10 Moyur power house (Madras) 36000
11 Pykara power house (Madras) 27200
12 Madras plant extensions (Madras) 30000
13 Khaperkheda thermal station (Maharashtra) 30000
14 Chola power station (Maharashtra) 78000
15 Ballarshah thermal station (Maharashtra) 7750
16 Bhira hydro-electric scheme (Maharashtra) 22000
17 Jog power station (Mysore) 72000
18 Nangal power house (Punjab) 48000
19 Kanpur thermal station (Uttar Pradesh) 15000
20 Pathri hydro-electric scheme (Uttar Pradesh) 20400
21 Sarda hydro-electric scheme (Uttar Pradesh) . 41400
22 Calcutta electric supply corporation extension (West Bengal) 30000
23 Delhi thermal station (Delhi) 20000

plant commissioned during Second Plan

Plant Commissioned During Second Plan

1 Machkund hydro-electric scheme (Andhra Pradesh and Orissa) 81000
2 Tungabhadra hydro-electric project (Andhra Pradesh and Mysore) 36000
3 Ramagundam thermal station (Andhra Pradesh) 37500
4 Umtru hydro-electric scheme (Assam) 8400
5 Maithon hydro-electric scheme (D.V.C.) 60000
6 Panchet hydro-electric scheme (D.V.C.) 40000
7 Bokaro thermal station extension (D.V.C.) 82500
8 Durgapur thermal station (D.V.C.) 165000
9 Ahmedabad thermal station extension (private sector—Gujarat) 15000
10 Utran thermal station (Gujarat) 45000
11 Poringalkuthu hydro-electric project (Kerala) 32000
12 Neriamangalam hydro-electric project (Kerala) 45000
13 Korba thermal station (Madhya Pradesh) 90000
14 Gandhisagar dam power station (Madhya Pradesh and Rajasthan) 69000
15 Bhilai steel plant power station (Madhya Pradesh) 25000
16 Madras thermal station extension (Madras) 30000
17 Periyar hydro-electric project (Madras) 105000
18 Kundah hydro-electric project (Madras) 145000
19 Trombay thermal station (private sector—Maharashtra) 187500
20 Akola (Paras) thermal station (Maharashtra) 30000
21 Ballarshah thermal station (Maharashtra) 15500
22 Khaperkheda thermal station extension (Maharashtra) 30000
23 Tungabhadra left bank power house (Mysore) 9000
24 Hirakud hydro-electric project (Orissa) 123000
25 Rourkela steel plant power station (Orissa) 75000
26 Bhakra-Nangal project (Punjab and Rajasthan) 207000
27 Kanpur thermal station extension (Uttar Pradesh) 15000
28 Eastern area power stations (Uttar Pradesh) 45000
29 Durgapur coke-oven plant thermal station (West Bengal) 60000
30 : Indian Iron and Steel Co., power station (Burnpur) (West Bengal) 20000

ANNEXURE VIII Principal generation schemes included in the Third Plan with benefit potential
(referred to in paragraph 48)

name of the scheme total installed capacity inKW
continuing schemes
1 Thugabhadra hydro-electric project stage II (Andhra Pradesh and Mysore) 36000
2 Nellore thermal station (Andhra Pradesh) 30000
3 Upper Silern hydro-electric project (Andhra Pradesh) 120000
4 Umiam hydro-electric project stage I (Assam) 36000
5 Barauni thermal station (Bihar) 30000
6 Pathratu thermal station (Bihar) 100000
7 Chandrapura thermal station (D.V.C.) 280000
8 Ahmedabad thermal station extension (private sector-Gujarat) 30000
9 Panniar hydro-electric project (Kerala) 30000
10 Sholayar hydro-electric project (Kerala) 54000
11 Gandhisagar dam power station IV unit (Madhya Pradesh and Raj asthan) 23000
12 Amarkantak thermal station (Madhya Pradesh) 60000
13 Neiveli lignite power station (Madras) 250000
14 Kundah hydro-electric project (Madras) 35000
15 Koyana hydro-electric project stage I (Maharashtra) 240000
16 Puma hydro-electric project (Maharashtra) 150QO
17 Bhadra hydro-electric project (Mysore) . 33200
18 Tungabhadra left bank power house (Mysore) 18000
19 Sharavathy hydro-electric project stage I (Mysore) 178200
20 Hirakud hydro electric project (Orissa) 147000
21 Bhakra-Nangal project (Punjab and Rajasthan) 164000
22 Rana Pratapsagar dam power house (Rajasthan and Madhya Pradesh) 128000
23 Riband hydro-electric project (Uttar Pradesh) 250000
24 Kanpur thermal station extension (Uttar Pradesh) 15000
25 Harduaganj thermal station (Uttar Pradesh) 60000
26 Matatila hydro-electric project (Uttar Pradesh) 30000
27 Yamuna hydro-electric project (Uttar Pradesh) 320000
28 Ramganga hydro-electric project (Uttar Pradesh) 127500
29 Jaldhaka hydro-electric project (West Bengal) 18000
30 Durgapur coke-oven plant power house extension (West Bengal) 150000
31 Delhi thermal station extension (Delhi) 30000
new schemes
1 Kothagudem thermal station (Andhra Pradesh) 120000
2 Ramagundam thermal station extension (Andhra Pradesh) 60000
3 Nagarjunasagar hydro-electric project (Andhra Pradesh) 100000
4 Srisailam hydro-electric project (Andhra Pradesh) 330000
5 Nahorkatiya thermal station (Assam) 67200
6 Umiam hydro-electric project stage II (Assam) 65000
7 Barauni thermal station extension (Bihar) 75000
8 Pathratu thermal station extension (Bihar) 250000
9 Thermal extensions in D.V.C. area (D.V.C.) 280000
10 Gandak hydro-electric project (Bihar) 15000
11 Kosi hydro-electric project (Bihar) 20000
12 Ahmedabad thermal station extension (private sector—Gujarat) 30000
13 Dhuvaran (Chambay) thermal station (Gujarat) 200000
14 Chenani hydro-electric project (Jammu and Kashmir) 15000
15 Jhelum hydro-electric project (Jammu and Kashmir) 27000
16 Salal hydro-electric project (Jammu and Kashmir) 60000
17 Sabarigiri (Pamba) hydro-electric project (Kerala) 300000
18 Idikki hydro-electric project (Kerala) 390000
19 Kuttiadi hydro-electric project (Kerala) 45000
20 Korba thermal station extension (Madhya Pradesh) 200000
21 Satpura thermal station (Madhya Pradesh) 180000
22 Tawa hydro-electric project (Madhya Pradesh) 42000
23 Punasa hydro-electric project (Madhya Pradesh and Gujarat) 576000
24 Kundah hydro-electric project (Madras) 240000
25 Mettur tunnel hydro-electric project (Madras) 100000
26 Periyar hydro-electric station extension (Madras) 35000
27 Neiveli lignite power station extension (Madras) 150000
28 Parambikulam hydro-electric project (Madras) 180000
29 Koyna hydro-electric project stage II (Maharashtra) 300000
30 Khaperkheda thermal station extension (Maharashtra) 60000
31 Akola (paras) thermal station extension (Maharashtra) 60000
32 Bhusawal thermal station (Maharashtra) 60000
33 Nuclear power station (Maharashtra and Gujarat) 300000
34 Vaitarna hydro-electric project (Maharashtra) 45000
35 Sharavathy hydro-electric project stage II (Mysore) 534600
36 Sharavathy tail race development (Mysore) 145000
37 Taleher thermal station (Orissa) 240000
38 Balimela/Guntawada hydro-electric scheme (Orissa and Andhra Pradesh) 240000
39 Bhakra right bank power house (Punjab and Rajasthan) 280000
40 Uhl river hydro-electric project stage 11 (Punjab) 40000
41 Upper Bari-Doab canal project (Punjab) 22000
42 Beas project stage I (Punjab and Rajasthan) 240000
43 Thermal extensions (Rajasthan) 90000
44 Kotah hydro-electric project (Rajasthan and Madhya Pradesh) 78000
45 Harduaganj thermal station extension (Uttar Pradesh) 30000
46 Singrauli thermal station (Uttar Pradesh) 250000
47 Obra hydro-electric project (Uttar Pradesh) 80000
48 Bandel thermal station (West Bangal) 300000
49 Delhi thermal station extension (Delhi and Punjab) 180000

ANNEXURE IX power—cost and benefits by States in Third Plan—State-owned utilities
(referred to in paragraph 48)

name of the State - outlay Rs. in lakhs benefits in MW
continuing schemes new schemes total during Third Plan 1966-67 first year of the Fourth Plan beyond 1966-67
from continuing schemes from new schemes total
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Andhra Pradesh 1934.0 4560.0 6494.0 178.8 180.0 358.8 100.0 510.0
2 Assam 550.0 2200.0 2750.0 31.0 96.2 127.2 25.0 25.0
3 Biharf 1535.0 4023.0 5558.0 130.0 245.0 375.0 95.0 20.0
4 Gujarat* 50.0 4598.0 4648.0 18.0 250.0 268.0 288.0
5 Jammu and Kashmir 127.0 870.0 997.0 14.8 20.0 34.8 23.0 69.0
6 Kerala 2676.0 1680.0 4356.0 334.0 334.0 50.0 435.0
7 Madhya Pradesh 2309.0 5291.0 7600.0 145.5 281.5 427.0 89.0 390:0
8 Madras % 319.0 9700.0 10019.0 35.0 335.0 370.0 220.0
9 Maharashtra* 1674.0 6450.0 8124.0 255.0 405.0 660.0 120.0
10 Mysore 3070.0 3897.0 6967.0 236.6 356.4 593.0 178.2 735.0
11 Orissa 657.0 3805.0 4462.0 147.0 180.0 327.0 60.0 240.0
12 Punjab 718.0 6046.0 6764.0 139.4 363.0 502.4 22.0 1240.0
13 Rajasthan 765.0 2735.0 3500.0 103.1 153.5 256.6 39.0
14 Uttar Pradesh 4640.0 6196.0 10836.0 415.0 230.0 645.0 50.0 471 5
15 West Bengal# 1367.0 2340.0@ 3707.O@ 168.0 300.0 468.0 9.0
16 Damodar Valley Corporation** 2974.0 3039.0 6013.0 280.0 140.0 420.0 140.0
total 25365.0 67430.0 92795.0 2631.2 3535.6 6166.8 1211.2 4432.5
Union Territories
1 Delhi 300-00 1490 -00 1790 -00 30-0 135-0 165-0
2 Himachal Pradesh 78-00 119-00 197 -00 2-0 2-0
3 Tripura 1-87 71-13 73-00 0-5 0-5
4 Manipur 5-50 101 -08 106 -58 2-8 2-8
5 Pondicherry 3-10 65-47 68-57
6 Andaman and Nicobar Islands 4 -25 10-10 14-35
7 Laccadive Minicoy and Amindive Islands 1.50 3-76 5-26
8 N.E.F.A. 16-57 43-43 60-00 1-0 1-5 2-5
9 N.H.T.A. 9-50 20-50 30-00 0-5 0-5 1-0
total of Union territories 420 -29 1924 -47 2344 -76 31-5 142-3 173-8
grand total 25785.29 69354.47 95139-76 2662-7 3677 -9 6340-6 1211-2 4432-5

# Excludcs outlay and benefits of D.V.C.
%Excludes outlay and benefits of Neiveli power station.
*Exeludes outlay and benefits of Nuclear power station.
**Includcs Centre's share.
@This is provisional and is subject to adjustment on account of increase in resources estimated at Rs. 4300 lakhs which the State Government expect to raise above the level of Rs. 9000 lakhs shown in Chapter VI—Financial Resources.
Note—Share of States from joint projects shown in the benefits for respective States.

ANNEXURE X Pattern of electricity consumption—all-India 1951-1961
(including generation in self-generating industrial establishment) (referred to in oaraeraDh 57)

class of utilisation 1951 1952 1953 1954
million kWh %of total million kWh %of total million kWh %of total million kWh %of total
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 domestic or residential light and small power 595.005 7.9 628.882 7.9 690.516 8.0 759.169 7.9
2 commercial light and small power 331 -533 4-4 336.628 4'3 399-107 4-6 446-156 4.6
3 industrial power* 4609.754 61.4 4908.222 61.4 5411.388 62-3 6002.887 62.9
4 traction 329.594 4.4 324.750 4.1 358.317 4.1 378.411 3.9
5 public lighting 67.917 0.9 73-942 0-9 81-445 0-9 93.938 1.0
6 irrigation 203.048 2.7 215.192 2.7 214.138 2.5 231.373 2.5
7 Public water works and sewage pumping 211.583 2.8 219.764 2.7 240.374 2.8 267.471 2.8
8 consumption of auxiliaries. transmission losses etc. (including 5 % of generation in self generating industrial establishments) 1165.537 15.5 1296.544 16.1 1285.811 14.8 1397.008 14.4
9 total generation** . 7513-971 100.0 8003.924 100.0 8681.096 100.0 9576.413 100.0

classes of Utilisation 1955 1956 1957-58
million kWh % of total million kWh % of Total million kWh %of total
(1) (10) (11) (12) (13) (14) (15)
1 domestic or residential} light and small power 850.426 7-9 934 -122 7-9 1094-564 8.0
2 eommecrial light and small power 514 -423 4-8 545 -853 4-6 611-512 4.5
3 industrial power* 6757 -063 62-6 7403 -858 62.5 8362 -737 61.3
4 traction 403 -302 3-7 404-925 3-4 421 -894 3-1
5 public lighting 105 -631 1-0 117-767 1-0 141-402 1.0
6 irrigation 254 -803 2-4 316-178 2-7 565 -817 4-1
7 public water works and sewage pumping 284 -637 2-6 317-076 2-7 365 -649 2-7
8 consumption of auxiliaries, transmission losses etc. (including 5% of generation in self-generating industrial establishments) 1606-981 15-9 1831-863 15-2 2093 -857 15.3
9 total generation** 10777-266 100.0 11871-642 100-0 13675-432 100.0

class of utilisation 1958-59 1959-60 1960-61(estimatc)
million kWh %of total million kWh %of total million kWh %of total
(16) (17) (18) (19) (20) (21)
1 domestic or residential light and small power 1238.044 8.0 1368.884 7.7 1492.0 7.5
2 commercial light and small power 682.818 4.5 758.988 4.3 870.0 4.4
3 industrial power* 9488.486 61.5 11015.074 62.0 12313.5 62.0
4 traction 441.549 2.9 440.594 2.5 449.0 2.3
5 public lighting 156.066 1.0 175.420 1.0 192.0 1.0
6 irrigation 583.482 3.8 727.026 4.1 836.0 4.2
7 public water works and sewage pumping 392.617 2.6 430.845 2.4 455.0 2.3
8 consumption of auxiliaries, transmission losses etc (including 5% of generation in self generating industrial establishments) 2431.507 15.7 2835.547 16.0 3242.5 16.3
9 total generation** 15414-569 100.0 17752-378 100-00 19850 -0 100-0

* In the absence of precise data, 5 per cent of generation in self-generating industrial establishments is assumed as losses.
** Includes generation from self-generating industrial establishments.

ANNEXURE XI Sector-wise growth of electricity consumption during First and Second Plans
(including generation in self-generating industrial establishments) (referred to in paragraph 57)

class if utilisation 1950* million kWh 1955* million kWh % increase over 1950 (First Plan) 1960-61 ** (estimate) million kWh %increase over 195S (Second Plan)
(1) (2) (3) (4) (5) (6)
1 domestic or residential light and small power 524.6 850.4 62.0 1492.0 75.5
2 commercial light and small power 308.8 514.4 65.5 870.0 69.3
3 industrial power # 3983.6 6757.1 92.5 32313.5 82.5
4 traction 308.4 403.3 30.8 449.0 11.3
5 public lighting 60.5 105.6 75.0 192.0 82.0
6 irrigation 161.7 254.8 57.6 836.0 228.0
7 public water works and sewage pumping 189.1 284.6 50.5 455.0 60.0
8 consumption of auxiliaries, transmission losses, etc. (including 5 % of generation in self-generating industrial establishments) 1038.0 1607.0 55.0 3242.5 102.0
9 total generation 6574.5 10777.2 64.0 19850.0 84.3

* Figures relate to calendar year.
** Figures relate to 1st April, 1960 to 31st March, 1961.
# Includes 95 per cent of generation from self-generating industrial establishments as in the absence of precise data, 5 per cent of generation in self-generating industrial establishments is assumed as losses.

[ Home ]